Paina Enter hakeaksesi tai ESC sulkeaksesi
On-site mobility: Quick assembly, stackable units, sanitation modules.
Problem: Construction sites need mobile housing that assembles faster than crews arrive, adapts to tight spaces, and avoids costly delays from slow setups.
Solution: Stackable units install in <4 hours with cranes. Integrated plumbing, electrical, and modular sanitation pods (toilets/showers) ship pre-fitted.
Benefit: Relocate entire camps overnight as projects progress—no demolition or rebuilds.
Emergency deployment: Flat-pack logistics, basic utilities, scalable layouts.
Problem: Emergencies demand instant, scalable shelter for thousands—often in logistics-challenged areas with zero infrastructure.
Solution: Flat-pack designs ship 70% lighter/faster. Assemble 100 units in 48 hours with basic tools. Include emergency kits: water filters, solar lights, partition-ready layouts.
Benefit: From 50 to 5,000 beds—deploy dignity where hope is scarce.
Tailored designs: Offices, medical units, hybrid complexes.
Problem: Unique sites—oil rigs, Arctic research, pop-up hospitals—need purpose-built complexes traditional builds can’t deliver fast or affordably.
Solution: Hybrid designs: stack offices over medical labs, connect dorm blocks to dining halls, or add helipad-ready roofs. Customize insulation, blast walls, or radiation shielding.
Benefit: Solve impossible briefs with modular engineering.
Advantage | Metric | ZN House Modular Builds | Traditional Builds |
---|---|---|---|
Speed | 50-bed camp deployment | 3–7 days | 3+ months |
Durability | Operational temperature range | −40 °C to +50 °C | Limited |
Eco-Impact | CO₂ reduction | 60% lower | Baseline |
Asset Value | Residual value after 10 years | 70% retained | < 30% retained |